Energy Guard Lite System
Lighter. Modular. MVTS Certified™.
A lightweight aerodynamic system built for faster installs, maximum ground clearance, and certified fuel savings — from 28′ pup doubles to 53′ dry vans. One system. One warranty. One install process.
Made in the
U.S.A.
Every Lite system panel, bracket, and fairing is built right here — no imports, no compromises.
★ ★ ★
Why Fleets Choose Lite
The Lite System delivers MVTS-certified fuel savings with a shorter, lighter skirt and a modular design that fits everything from 28′ pup doubles to 53′ dry vans — with one warranty and one install process your team already knows.
Return 01
Max Fuel Economy Gain
MVTS Certified™ at 65 MPH.
53′ dry van with full Lite system.
Fuel Economy
Up to $4,799 annual savings per 28′ pup trailer at 125,000 miles/year. Certified data — not a calculator estimate.
Return 02
Total System Weight
Full 53′ system. Less weight,
more cargo capacity on every load.
Cargo Capacity
At 104 lbs, the Lite system is one of the lightest complete aero packages available.
Return 03
More Ground Clearance
vs. leading competition.
Fewer scrapes. Less downtime.
Damage Reduction
Up to 6″ more clearance than leading competitors means fewer dock and road impacts.
Return 04
Full System Install
Skirt, fairing, and flaps.
Fewer brackets. Less labor.
Labor Savings
Self-aligning brackets and a streamlined design cut install time dramatically.
System Engineering
Every component in the Lite system is engineered to work together — reducing drag at the underbody, rear, and tires simultaneously. This is how aerodynamics compounds into real savings at the pump.
A 132" × 27" fiberglass-reinforced composite panel — shorter and lighter than the standard system. Closes off the trailer undercarriage to redirect airflow away from rotating components and wheel wells.
6 brackets per trailer (3 per side) made from high-grade impact-resistant nylon. Flex 180° in both directions without cracking. Self-aligning design means no guesswork during install.
Fixed flush to the rear of the trailer roof — always deployed, no floppy top, no driver interaction required. At 29 lbs, it eliminates the low-pressure drag zone that follows every trailer.
Aerodynamic mud flaps deliver an additional 3.6% fuel economy improvement and 4.2 gallons saved per 1,000 miles. Angled louvers direct spray down and away from following vehicles.
The Lite skirt's 27" height and optimized bracket geometry gives you up to 6" more ground clearance than leading competitors.
No hinges. No deployment levers. No pre-trip checks for aerodynamic components. Every part of the Lite system is permanently fixed.
Certified Performance Data
| Fuel Economy Improvement | 9.92% |
| Est. Annual Savings | ~$2,778 / trailer / yr |
| Test Configuration | 53′ dry van, 65 MPH |
| Full System Components | Skirt + Top Fairing |
MVTS Certified™ at 65 MPH on modern Class-8 trucks. Annual savings estimated at 125,000 miles/year. Actual results may vary.
| Fuel Economy Improvement | Up to 9.92% |
| Est. Annual Savings | ~$4,799 / trailer / yr |
| Test Configuration | 28′ pup doubles, 65 MPH |
| Skirt Only (no fairing) | Lite Skirt configuration |
MVTS Certified™ at 65 MPH on modern Class-8 trucks. Annual savings estimated at 125,000 miles/year. Actual results may vary.
About MVTS Certification
MVTS (Manufacturer’s Verification Test Standard) is an independent, standardized road-test protocol used to certify aerodynamic fuel-savings claims on Class-8 trailers at highway speed.
Product Snapshot
Website-level specifications. Final fitment and installation should follow the current Energy Guard Lite installation manual.
Lite Skirt
Skirt
| Panel Size (each) | 132" × 27" |
| Kit Weight | 67 lbs / set |
| Material | Fiberglass Reinforced Composite |
| Bracket Material | Impact-Modified Nylon |
| Brackets per Trailer | 6 (3 per side) |
| Ground Clearance | Up to 6" more vs. competition |
| Install Time | 30 min (2 technicians) |
| Warranty | EverGuard® Lifetime |
Includes integrated rib cover. Cleaning surfaces with brake cleaner will void tape adhesion.
AeroEnd™ Top Fairing
Fairing
| Weight | 29 lbs |
| Flange Width | 100" to 102.5" |
| Material | Thermoplastic Polyolefin (TPO) |
| Moving Parts | Zero — always deployed |
| Driver Interaction | None required |
| Install Time | 20 min (1 technician) |
| Weight vs. Competition | 29 lbs vs. 43–70 lbs |
| Warranty | EverGuard® Lifetime |
Fixed flush to the rear trailer roof. Adds up to 1.75" of height at rear.
Energy Flaps™
Flaps
| Fuel Economy Gain | 3.6% |
| Gallons Saved | 4.2 gal / 1,000 mi |
| Available Sizes | 18"×30" / 24"×30" |
| Material | Impact-Resistant Polypropylene |
| Custom Branding | EnerLogo™ — molded in |
| Install Time | 5 min (1 technician) |
| Warranty | 2-Year Limited |
MVTS Certified™ vs. solid flaps at 65 MPH on 28′ double trailers.
Complete 53′ System Totals
104 lbs total weight
Full Install Time
<1.5 hrs
Compatible Trailers
28’–53′
EVERGUARD®
LIFETIME
WARRANTY
Every Lite skirt panel, bracket, and AeroEnd™ top fairing is backed by the EverGuard® Standard Limited Lifetime Warranty — effective January 1, 2026. If your panels fail from a defect in materials or workmanship at any point during the trailer’s service life, we stand behind them. That’s not a handshake deal — it’s a written commitment.
Get Started
Ready to spec the Lite system for your fleet? Talk to an Energy Guard specialist — we’ll help you find the right configuration, confirm trailer fitment, and get you a quote.